Senior Subsea Supervisor

  • Regions
  • Country India
  • City India
  • Type of Employment Contract
  • Job number WTSziad.moh25194

About the job


  1. Ensuring the safe, efficient and cost-effective deployment of Subsea XT and upper completion equipment on the rig.
  2. Supervision and monitoring of XT installations and well upper completion operations in accordance with company objectives and policies.
  3. Ensure all rig upgrade requirements are addressed to handle Subsea and Upper completion equipment. Interface with rig contractor and other subsea contractors to ensure deliveries are met.
  4. The subsea supervisor will be responsible for oversight and planning of onshore preparation and offshore installation of subsea equipment in collaboration with the drilling/completions, O&M, Projects teams as well as the Drilling Contractor, Third party subsea vendors, and Equipment Suppliers.
  5. Installation and testing of IWOCS control panel, umbilical reeler on the rig while interfacing with the rig personnel.
  6. Installation and testing of Completion/Workover Riser or Subsea Landing String equipment (including control panel and electrohydraulic umbilical reeler) on the rig.
  7. Testing of all functions of Lower Landing String Assembly (LLSA)and LLSA along with Tubing Hanger.
  8. Supervising all Slickline operations such as installations/retrieval of crown plugs and TH Isolation Sleeve.
  9. Visiting intervention vessel for any supervisory activities, when necessary.
  10. Supervising testing and maintenance activities in contractor’s bases/workshops.

Terms and Conditions:

  1. Type- Contract Hire
  2. Location - Will be based in India (Offshore)
  3. Rotation – 28 Days ON/ 28 Days Off


Operations and Technical:

  1. Engineering or industry-related qualification.
  2. Preferably IWCF well control certificate.
  3. Minimum 15 years industry experience in subsea well drilling and upper completion operations with a strong background in subsea completion operations.
  4. Should have been the Subsea Supervisor for at least 3 other projects with an operator.
  5. Experience of developing and implantation of procedures and work instructions.
  6. Shall have expertise in subsea horizontal Xmas Tree systems, IWOCS and subsea Test Tree and landing string equipment.
  7. Capable of performing space-out calculations and accounting for tidal movements for floaters.
  8. Shall have expertise in subsea wells equipment and Rig BOP’s and other rig interfaces.
  9. Familiar with ROV’s, ROV tooling and interfaces.
  10. Should be familiar with the installation and operations of Upper Completion equipment e.g. production packer, deep set pressure assisted SCSSV, downhole gauges, CIM, etc.
Send to email